Supervision
Supervision
#From idea to creation

Planning services

1- Reviewing and commenting on how to separate the project into different projects and activities in terms of assigning it to the executive agents (consulting service units for these ancillary and complementary works, contractors and equipment sellers) which has been done in the detailed and executive design stage. . 2- Determining the joint chapter between the separate services that can be assigned to the consulting service units for ancillary and complementary works, contractors and equipment sellers, and determining the responsibility of each. 3- Reviewing and commenting on the general schedule of project implementation, which has been prepared in the detailed and executive design stage. 4- Pursuing to create a project planning and control system by contractors and equipment sellers and monitoring its implementation 5- Reviewing and approving the detailed schedule of consulting service units, contractors and equipment sellers and other factors involved in the design and establishing coordination between their plans within the framework of the general schedule according to the preliminary report of workshop supervision agents. 6- Reviewing and approving the program of providing manpower and machinery for contractors 7- Reviewing the monthly work progress report by summarizing the reports of consulting services units, monitoring apparatus, contractors and equipment sellers, comparing the operations performed with the schedule, providing solutions for their compensation and reflecting in the revision plan according to the preliminary report. Workshop supervision agents 8- Revising and updating the general schedule according to the progress of the work and based on the reports and analyzes received according to the preliminary report of the workshop supervision agents.

Engineering Services

1- Review the design if necessary and suggest changes 2- Determining the method of monitoring and determining the stages of work visits 3- Preparing forms and documents related to tests, periodic work visits and issuing certificates of completion in various stages, form of functions and agenda 4- Preparing a list of workshop tests 5- Preparing a list of laboratory equipment and special tools 6- Procurement, setting technical documents such as standards that are necessary to control the quality of work in the workshop. 7- Checking and approving the list of manpower required for the work 8- Checking and approving the list of machines and tools for performing the work 9- Preparing a list of major materials and materials and design equipment 10- Preparing instructions for storing materials and equipment in the workshop warehouse and after installation 11- Examining and approving the list of spare parts and materials required for the operation period by determining the relevant time period 12- Following up and preparing instructions for maintenance and strategy of equipment by their suppliers, adjusting and confirming the adequacy of these documents 13- Possible revision of the plans and technical specifications according to the executive necessities, preparation of plans and correction documents in order to adapt to the new findings and conditions and to meet the needs of the schedule. 14. Preparation of detailed supplementary plans and detailed executive plans for the full implementation of the work to the extent that there are no bottlenecks and problems due to the defect of the plan or agenda, in operation, in coordination with the workshop supervision agents.

Quality control services

1- Carrying out periodic inspections and adapting executive works with drawings and technical specifications, standards and agendas and confirming the accuracy of their implementation before being covered or the components of the next steps while fully coordinating with the workshop supervision agents and providing appropriate and corrective solutions to problems. Probable 2- Checking and approving the control of maps, axes and levels implemented on the ground and confirming their compliance with the maps before starting the operation of each part and controlling the mapping operation in different stages of the work while fully coordinating with the workshop supervision agents. 3- Coordination to control the maintenance of sign and origin points by the contractor 4- Measuring deformations and displacements and controlling the allowed tolerances 5- Periodic supervision on how to maintain and store materials, materials and equipment in the workshop and their movement 6- Preparing a plan and order for performing tests and controlling and confirming the variety of tests of materials, equipment and works performed by determining the type of test and their location. 7- Controlling and approving the process of performing tests, their results and informing the contractor about the agenda for repairing defective materials and equipment or works. 8- Order to correct faulty works and follow them up 9- Confirming the specifications of the materials of the equipment that should be used in the work in terms of compliance with the technical specifications and executive plans before the purchase order and before consumption. 10- Supervising the delivery of materials and equipment delivered by the employer to the contractors and reviewing and announcing the opinion of compliance with the technical specifications and executive plans before the purchase order and before consumption. 11- Preparing instructions on supervising how to maintain and take care of the work performed 12- Reviewing, announcing opinions and approving workshop plans prepared by contractors

Estimation services

1- Reviewing and updating the financial and legal documents of the contracts, including estimating the cost of services and executive operations and other needs of the implementation period in order to refer the works and services and concluding related contracts. 2- Reviewing and commenting on the projected budget and projected credit in order to modify the financial plan 3- Confirmation of prepayment installments 4- Providing appropriate and appropriate instructions and forms regarding the coordination of measurements of work performed and work materials, as well as control and approval of status and payments of contractors and equipment sellers and other design factors for payment by the employer based on reports by workshop supervisors. 5- Controlling the change of amounts of works and additional amounts or defects of contracts 6- Determining the remaining amount of work at the end of each year and when required by the employer 7- Matching the employer's decisions with the documents of the relevant contract and notifying them for implementation 8- Checking and approving new prices 9- Investigating the delay of the contracts and announcing the opinion on whether they are allowed or not 10- Pursuing the establishment of the necessary types of insurance coverage and handling insurance issues in case of damage 11- Analyzing and reviewing contractual issues and commenting on the claims of contractors and sellers of equipment and other factors and cooperating with the employer in resolving disputes. 12- Principles of ensuring the fulfillment of all obligations and services of contracts 13. Reviewing the final accounts of contractors, equipment sellers and other factors 14- Reviewing and announcing the opinion on the return of guarantees of contractors and sellers of equipment and other factors based on their contracts

Definite delivery service

1- Periodic inspection and monitoring and performance of the project in the pilot operation period (warranty period) 2- Order the tests if necessary and check their results 3- Investigation and analysis of deformation measurement and control of permissible tolerances 4- Controlling the performance of contractors and other factors involved in the project during the warranty period 5- Addressing the shortcomings and defects in the period of guaranteeing the preparation of their list and following up, monitoring and eliminating them by the relevant factors 6- Cooperating with the employer and the operator to implement the correct operation methods and instructions 7- Ensuring the elimination of defects and confirmation of work readiness for final delivery at the end of the warranty period 8- Participating in the final delivery board and preparing the final delivery minutes